Keep every lift moving, and prove it.
An Odoo 20 service core for breakdown calls, field visits, signed reports and installation projects, working beside GERP in Makati, Cebu and Cagayan de Oro.
→ or click to begin · O all slides
Fifty-five years of keeping the Philippines moving.
- 1971Founded as Hi-Eles Industrial; a Hitachi subsidiary since 2011Your About Us page
- 3Offices in Makati, Cebu and Cagayan de Oro, each with its own lineContact Us
- 24/7Maintenance, backed by
readily available maintenance parts
Services - 67Units for NSCR Phase 1: 21 elevators, 46 escalators, 7 stationsHitachi news, 8 September 2021
- 2025Body cameras with QR worksite scanning for your field teamsYour news release, 22 November 2025
From your public pages only. Everything else in this deck is ours to confirm with you.
CP01 · 13 elevators, 26 escalators
CP02 · 8 elevators, 20 escalators
Six places where Odoo takes the load.
- 01Three lines for every breakdown callEach office takes calls on its own line, with no shared clock on the 24/7 promise.
- 02Renewals watched by handContract end dates are followed up by a person, three months ahead.
- 03Dispatch without the full pictureWho is free, what they carry and which van is out, in one view.
- 04Proof of visit in two placesBody cameras record the site; checklist, parts and signature can sit with the clip.
- 05Parts found out on siteBranch stock checked when the job is booked, not when the van arrives.
- 06Handover to maintenance planEach new unit needs its preventive plan and contract from day one: 67 on NSCR.
Helpdeskone queue, response clocks
Planningfield service in Odoo 20: jobs, worksheets
Subscriptionscontracts, renewals, recurring invoices
Signrenewals signed online
Inventorystock per branch, reserved per job
Purchasereorders from your suppliers
Projectinstallations, station by station
Documentsvisit reports, drawings, certificates
Hypotheses from public information, to test with you in discovery. Point at one to follow its line.
A service layer beside GERP, not another ERP.
Click any box. Odoo runs the service work; GERP keeps the books.
From the first ring to the signed report.
Tower A, Makati CBD · Car 2
Car stopped between floors 8 and 9, two passengers inside.
Sample building, names and times. Response targets come from your contracts.
Who's where, carrying what.
Preventive visitBreakdownInstallation
Every visit, on the record.
- 09:19 · QR check-in at Car 2camera clip BC-0417 linked to the visit
- 09:34 · Checklist 6 of 6monthly preventive visit
- 09:36 · Three photosmachine room, car top, landing door
- 09:41 · One door roller kit usedMakati stock updated
- 09:46 · Signed by the building adminon the technician's phone
- 09:47 · Report e-mailed as a PDFbillable line to GERP, if chargeable
- Car and landing doors
- Brake and machine
- Ropes and sheaves
- Safety gear test
- Pit and car top
- Alarm and intercom
The body-camera programme keeps running. Each visit record keeps the clip ID, so footage and paperwork point at each other.
Checklist, photos, parts and the signature become a PDF for the building owner, on the day.
Odoo 20 creates and edits records offline, and syncs them when the connection is back. Every unit keeps its visit history.
Renewals that raise their hand, 90 days out.
The unit, its site and serial number become an equipment record with its contract and visits. In Odoo 20, each visit shows whether the unit is under contract.
An automation on the end date sends the renewal quotation and gives the salesperson a dated follow-up. Nobody has to watch the calendar.
The paid contract starts on the day the free period ends, and its invoices go to GERP on schedule.
Every contract ending this year, in one view.
RenewedQuotation sentDue, not contactedNot due yet
Sample data for twelve months of contract end dates. Point at a month for its numbers.
Parts confirmed before the van leaves.
Odoo proposes a transfer of 2 from Makati, arriving tomorrow, instead of a 6-week order.
To confirm in discovery: branch stock may already live in GERP. Sample stock, lead times and quantities.
NSCR-scale installs, one plan to handover.
DeliveryInstallationTesting and commissioningHandover
Point at a station. Each one is a project stage with its tasks, drawings, test certificates and handover forms.
Stations, packages and unit counts from Hitachi's 2021 release; the schedule is an illustration.
The 24/7 promise, with a number on it.
MakatiCebuCagayan de Oro
Sample figures, to show the view. The real ones come from your first months on Odoo.
Ten apps, the service core first.
Depends on how much GERP already covers, parts and stock included. We confirm it in discovery.
- GERPthe ledger, invoices and collections
- Body camerasfootage stays in your programme
- Group systemsgoverned by Hitachi
- GERP interfaceinvoice lines out, payment status back
- Camera clip IDssaved with each visit
Built on Odoo 20. Odoo licences are billed by Odoo per user. Our work is quoted after discovery.
A pilot in Makati, then Cebu and Cagayan de Oro.
An illustration in weeks. The plan and dates come out of discovery.
Five questions that shape the scope.
1What does GERP hold today: finance only, or contracts, orders, purchasing and stock too?
It decides phase 2: whether Odoo takes over a manual process or sits beside an existing one, and how much the interface carries.
2Where do maintenance contracts and equipment records live now?
That is where the data migration starts: units, sites, contract dates and visit history.
3Does Hitachi's remote monitoring run in the Philippines?
If alarms exist here, they can open tickets on their own, before anyone calls.
4What response times do your contracts promise, by priority?
They become the SLA policies the clock runs against, per customer and per contract.
5Where does body-camera footage go, and who reviews it?
So each visit record can point to its clip, and the review happens in one place.
- A fixed scope for phase 1, and a decision on phase 2
- A quotation for our work
- A pilot plan for Makati, with dates
- The GERP interface, agreed with group IT
Let's follow one breakdown, end to end.
A half-day workshop in Makati: we map one breakdown call and one contract renewal on your real process, then show both running in Odoo 20.